Tuesday, August 17, 2010

Ipe decking

Ok so I researched Ipe for a while and finally got the project going. Of course no research is ever complete - some things I read here a while ago went in one ear out the other, things change, I changed my mind about stuff, etc

Here are my pics so far:
IpeDecking

The deck is about 14 by 26, framed with 2x10s, 12 inches on center. Right side of the deck is about 2 foot off the ground, left side is about 4 or 5 feet. There will be one Ipe step, off the deck to the bluestone patio. I'm not exactly sure how I'm going to do that, any ideas? Should I leave out the risers, so there will be enough ventilation?

Of course I hunted around for the best price on Ipe. The usual suspects East Teak, Advantage Lumber, etc. were still higher than best priced local lumber yard, Rings End Lumber in Lewisboro NY. I know 2 builders that use Rings End and they love their Ipe. But last minute, I ended up going with a crazy website where you submit an Ipe request and companies bid on it. Turns out the company with the best bid was actually the wholesaler/supplier for Rings End, what a coincidence. So I went with them. I wasn't only going for lowest bid, but lowest bid from a company with good quality Ipe, and I'm pretty happy with it. It was like John said in one of his posts, it has some band marks, end of the board with some stains from the sealer, etc., but the boards looked great. I got a mix of 8, 10, 15, 16 and 20 footers (mostly the larger sizes).

I bought 2.5 inch stainless steel screws from Fasco Fastener, 1/8 cobalt drill bits, carbide tipped chop saw blades, and a used eBay BoWrench. So I just put my first Ipe board down, screwed from the top. You can see that in the second picture - does it look like I did it right? I used another drill bit about the size of the screw head so the screw would go down below the surface slightly. Now I'm having second thoughts, and am considering plugging. Seems like only slightly more work than I'm already doing, using 3 drills as it is, not sure what to do right now with that.

Also second thoughts on the deck rail, I had decided to go with PT 4x4 posts, sleeved with PVC and a deck rail from these guys:
Wayside Fence

This would be much cheaper than TimberTech rail, etc. And somewhat cheaper and much less work than Ipe rail. I thought with the Hardie siding and white Azek trim, it would be a good choice. But now I'm having second thoughts, if the PVC rail will look too shiny. The Azek is much less shiny, more of a smooth matte finish. Any suggestions? Should I rip out the 4x4 PT, and put in Ipe posts? Or has anyone ever wrapped PT with some 1x6 Ipe?

Here is the post I made on the gardenweb forums

.

Monday, March 22, 2010

Hallowell Acadia update

OK I have not posted on my blog for a while, but I figured I'd share the results of the Hallowell heat pumps.

For the 2 month period 05-Jan-2010 to 02-Mar-2010, I used a total of 6465 killowatts, for which NYSEG charged me $746.67. So that is 373.33, for the 2 coldest months of the year.

That covers all of my electric usage - lights, appliances, plasma tv, etc, an 80 gallon electric water heater, and the Hallowell system. I keep the temperature set at 68 all day, and 65 at night (1 am to 9 am).

I am extremely happy with that. I would estimate that my electric water heater accounts for about $80 per month. The lights, appliances, plasma tv, etc I am guessing to be $100-$120. Which would leave my Hallowell heating cost at around $183 per month for Jan and Feb.

If I had been heating my house with oil (natural gas not available here), I would have to believe I would have gone through a 275 gallon tank in 3 weeks or less. Thats how much usage I had at 2 prior houses, which were half the size of the new one, but less well insulated. So lets say 13 gallons of oil, for 57 days is 746 gallons. At a price of $2.40 a gallon, that would have cost me $1792 (or $896) for the same time period.

That sounds shocking to me? Anything wrong with my math? $183 for Hallowell, $896 for oil?

Here are my actual bills:

January Bill

February Bill


UPDATE: PLEASE READ MY OTHER POSTS ABOUT THE HALLOWELL ACADIA. I'm having compressor problems like many other Hallowell Acadia Owners...

Also if you deal/install/own a Hallowell Acadia, please join the Hallowell Acadia Google Group.
.

Thursday, June 11, 2009

Chandelier lifts

It's a major pain to change the light bulbs on a chandelier. So I was thinking about getting a motorized chandelier lift to lower the chandelier to floor level, change the bulbs, or clean the thing, and then hoist it back up. But searching around, I got sticker shock! Those things cost around $1000, just as much as the chandelier does!!! I would never pay that much.

Then I got to thinking: I dont need a fancy motorized one, with a switch at the bottom of the foyer. Why not get a simple, manual lift, that you can crank up/down yourself, from up in the attic? Something like that must exist, and it must be much much cheaper, right?

Well I can't find one anywhere. Please leave me a comment if you do.

OK, so they make all kinds of lifts and chain hoists for mechanical equipment. Stuff that can lift a half ton, and it only costs like $139. Can't someone adapt something like this for chandeliers?

southern-tool.com hoist


GardenWeb Post