The garage footing was poured today. 9 yards of concrete. The footing was double wide and pinned to the main house foundation with rebar.
The footing forms were inspected yesterday by the Town of Carmel inspector. I called for the inspection on Wed 8/27 but they could not come out to inspect until Tue 9/2.
Ed excavated for the footing Tue 8/26.
I drilled the 5/8 holes for pinning to the existing house foundation with rebar on Wed 8/27.
Paul formed the footings Fri 8/29.
Photo of the Garage Footing Forms