Tuesday, September 9, 2008

Garage Walls poured

Poured this morning, before the rain. Glad to get something else finished.

The southeast wall of the garage was poured the full 9'4". So the top of that wall will be about 6 feet above the garage floor height. This is so I can backfill that wall, to help me with the severe elevation difference on the eastern property line. The other 3 walls will be just a few inches higher than the garage floor height.

No comments: